TECHNICAL PUBLICATIONS

COMPLETED PROJECTS






PROJECT 2006










    


Copyright © Evenfit Consult Sdn. Bhd.

No.

Projects

Clients

Year Completed

1

Inspection Work of Retaining Wall along Ampang - Kuala Lumpur Elevated Highway

Projek Lintasan Kota Sdn. Bhd.

December 2006


2

Crack Monitoring of Pier JTR/4/2 and Pier 5 of Bridge No.6/45 EB along Ampang - Kuala Lumpur Elevated Highway

Projek Lintasan Kota Sdn. Bhd.

December 2006


3

Structural Auditing for East Coast Expressway Project - Phase II

MTD Prime Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

November 2006


4

Design of Bridges at Package 6 (Kuala Lumpur - Putrajaya Highway Project)

Ikhmas Jaya Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

October 2006


5

Structural Auditing - Projek Subang - Kelana Link, Selangor Darul Ehsan (Phase I)

Ahmad Zaki Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

October 2006


6

Structural Auditing - Projek Menaiktaraf Jalan Benta - Jerantut - Maran, Pahang Darul Makmur (Fasa 1)

Teratai Sanjung Holdings (M) Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

September 2006


7

Design of Federal Bridges in Terengganu Darul Iman

Mesh Engineering Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

August 2006


8

Structural Auditing - Projek Menaiktaraf Jalan Benta-Jerantut-Maran, Pahang Darul Makmur (Fasa 3)

Perunding Bersatu Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

July 2006


9

Inspection for Tunnels at Kuala Lumpur - Karak Highway

MTD Prime Sdn. Bhd.

July 2006


10

Inspection of Bridges along Butterworth-Kulim Expressway (BKE)

Konsortium Lebuhraya Butterworth-Kulim Sdn. Bhd.

April 2006


11

Design of Federal Bridges in Perak Darul Ridzuan

NRS Associates Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

February 2006


12

Design of Sungai Kerang Bridge for Ladang Gemilang, Gedong, Sarawak

Sen Meng Kang Construction Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

January 2006


13

Design of an Integral Bridge at Sungai Nyak Besar, Pahang Darul Makmur

Jurunding HYH Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

January 2006

14

Structural Auditing - Projek Menaiktaraf Jalan Johor Bahru - Pasir Gudang, Johor Darul Takzim

S.P. Setia Berhad /

K&N Consulting Engineers Sdn. Bhd.

January 2006

PROJECT 2007









    


No.

Projects

Clients

Year Completed

1

Structural Auditing - Cadangan Membaiki Jalan Loke Yew Sambungan Kuala Lumpur

MTD Construction Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

December 2007


2

Crack Monitoring at Crosshead JTR 3/4

Projek Lintasan Kota Sdn. Bhd.

December 2007


3

Projek Penswastaan Lebuh Raya Kemuning – Shah Alam (LKSA)

Projek Lintasan Kota Sdn. Bhd.

December 2007


4

Inspection of Bridges along Ampang - Kuala Lumpur Elevated Highway

Projek Lintasan Kota Sdn. Bhd.

December 2007


5

Design of Reinforced Concrete Parapet to Replace Steel Railing at Bridge at KM 25.5WB at Kuala Lumpur - Karak Highway

Terratech Consultants (M) Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

November 2007


6

Cracked Beam Adjoining Walkway and Main RSA Building at Temerloh RSA West Bound, East Coast Expressway Phase I

Terratech Consultants (M) Sdn. Bhd.

November 2007


7

Design of Concrete Parapet for Viaduct 4 (KM 39.53 EB) at Kuala Lumpur - Karak Highway

Terratech Consultants (M) Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

October 2007


8

Design of Concrete Parapet for Bridge 54.7 WB at Kuala Lumpur - Karak Highway

Terratech Consultants (M) Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

September 2007


9

Cracked Beam Adjoining Walkway and Main RSA Building at Gambang RSA East Bound East Coast Expressway Phase 1

Terratech Consultants (M) Sdn. Bhd.

September 2007


10

Alternative Design for Membina Jejambat Di Persimpangan Jalan Sultan Azlan Shah / Jalan Tambun, Ipoh, Perak Darul Ridzwan

IZA  Construction Co. Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

August 2007


11

To Carry Out Condition and Structural Assessment of Existing Bridges Within The Alignment Lebuhraya Kemuning - Shah Alam (LKSA)

Projek Lintasan Shah Alam Sdn. Bhd.

July 2007


12

Inspection, Inventorisation and Assessment of Bridges along Kuala Lumpur - Karak Highway for The Annual Report 2006

MTD Prime Sdn. Bhd

April 2007


13

Conduct Independent Inspection & Development of Bridges Information System (BIS) of All Bridges along East Coast Expressway - Phase 1

MTD Prime Sdn. Bhd

April 2007


14

Study on Inspection, Assessment, Inventorisation and Maintenance of Federal Bridges in The States of Sabah, Sarawak and Labuan

KTA (S) Sarawak Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

April 2007


15

Design of Bridges for Privatisation of Senai - Pasir Gudang - Desaru Expressway Project - Bridge over Selat Mendana

Ranhill Antara Koh Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

February 2007


16

East West Link & Kuala Lumpur - Seremban Highway Project.

Metacorp Berhad

February 2007


17

Proposed Inspection, Design and Supervision for Rehabilitation of Damaged Concrete Deck Slab at Bridge 6 (South Bound and North Bound), Kuala Lumpur - Seremban Highway

Metramac Coproration Sdn. Bhd.

February 2007


PROJECT 2008










    


No.

Projects

Clients

Year Completed

1

Design of a New Bridge over Sungai Pinang at Jalan Jelutong, Penang.

Majlis Perbandaran Pulau Pinang

December 2008


2

Menaiktaraf Jalan Tampoi Kepada Empat Lorong, Johor Bahru

Syarikat Ismail Ibrahim Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

August 2008


3

To conduct Condition Assessment on Bridges located along Lebuhraya Damansara - Puchong

Lingkaran Trans Kota Sdn. Bhd.

July 2008


4

To conduct Condition Assessment on Bridges located along SPRINT Highway

Sistem Penyuraian Trafik KL Barat Sdn. Bhd.

July 2008


5

Structural Auditing – Projek Subang - Kelana Link, Selangor Darul Ehsan (Phase II)

Ahmad Zaki Sdn. Bhd. /

K&N Consulting Engineers Sdn. Bhd.

July 2008


6

Membina Jalan Lingkaran Tengah Seremban, Negeri Sembilan - Fasa 2 & 3A

Konsortium Temokin - Vila Jelas JV Sdn. Bhd. / K&N Consulting Engineers Sdn. Bhd.

July 2008


7

Detailed Inspection of Bridge Abutment at Sg. Bakapor

Terratech Consultants (M) Sdn. Bhd.

July 2008


8

Professional Consultancy Services as Investigation and Design of Remidial Solution of Crack at Pier Crossbeam and Walked Bearing at Bridge Over Bulatan Selangor for Privatisation Project of Kemuning - Shah Alam Highway (LKSA) in Selangor Darul Ehsan

Projek Lintasan Shah Alam Sdn. Bhd.

July 2008


9

Cadangan menjalankan Kerja-Kerja Kajian ke atas Pemeriksaan, Inventorisasi dan Pembangunan Sistem Pengurusan Jambatan/Jejambat Di Wilayah Persekutuan, Kuala Lumpur untuk Dewan Bandaraya Kuala Lumpur

Dewan Bandaraya Kuala Lumpur

June 2008


10

Detailed Inspection of Bridge Abutment at Sg. Pohoi

Terratech Consultants (M) Sdn. Bhd.

May 2008


11

East Coast Expressway Phase I - Investigation & Repair of Bearings for Bridges : I)E8/158/65 EB&WB, Sg. Jempol II)E8/159/85 EB&WB, Crossing FT 62 III)E8/168/95 EB&WB, Sg. Maran IV)E8/168/85 Bukit Teladas Waterfall (R64) V)E8/171/80 EB&WB, Sg. Chedong

Terratech Consultants (M) Sdn. Bhd.

May 2008


PROJECT 2009










    


No.

Projects

Clients

Year Completed

1

Kerja-Kerja Pengukuhan Tapak Bangunan Pusat Hidrografi Nasional, Pangkalan TLDM Pulau Indah, Klang, Selangor Darul Ehsan

KT Law & Associates Sdn. Bhd.

December 2009


2

Consultancy Services to Carry Out Bridge Condition Assessment for Guthrie Corridor Expressway

Prolintas Expressway Sdn. Bhd.

November 2009


3

Repair of Damaged Beams At Bridge 4 – Bukit Jelutong Sentral Interchange Overpass, Selangor Darul Ehsan.

Prolintas Expressway Sdn. Bhd.

May 2009


4

Assessment of Bridges Over Sg. Selabit, Sg. Bok, Sg. Teman and Sg. Bakong

Konsortium Malaysia

April 2009


5

Senai – Pasir Gudang – Desaru Expressway Project Package 2 – Damaged RC. Culvert

Hercules Engineering Sdn. Bhd.

April 2009


6

Investigation of Cracks in building at Block 7 of Taman Seri Lembayung Flats in Shah Alam, Selangor Darul Ehsan

PPC – Gadang

January 2009


PROJECT 2010










    


No.

Projects

Clients

Year Completed

1

Privatisation of Kuala Lumpur - Karak, Repairing of Bridge 42/68EB and 42/72WB along Kuala Lumpur – Karak Highway

Terratech Consultants (M) Sdn. Bhd.

December 2010


2

Strengthening Design of Columns for ‘Struktur Bangunan bagi Projek PPR (M) Bandar Baru Jerantut Fasa II, Jerantut, Pahang'

Retrofit System Sdn. Bhd.

December 2010


3

Program Menilai, Membaiki/Menggantikan Jambatan di Jalan Persekutuan Negeri Sarawak (Fasa 2), Package A : Proposed Batu Kawa Bridge Extension, Kuching Division, Sarawak

Hart Builders Sdn. Bhd. /

K &N Consulting Engineers Sdn. Bhd.

December 2010


4

Study on Geotechnical & Structural Integrity of Jambatan Sg. Kuah, Langkawi, Kedah

Kumpulan IKRAM Sdn. Bhd.

December 2010


5

East Coast Expressway Phase 1, Inspection & Investigation to Determine the Nature and Sources of Damage/Problem to Bridge over Sg. Chedong, Sg. Jempol, Sg. Maran and KTM Railway

Terratech Consultants (M) Sdn. Bhd.


November 2010

6

Consultancy to conduct Condition Assessment for Damansara Utama Underpass Located at KM 7.6 to KM 8.2 LDP

Lingkaran Trans Kota Sdn. Bhd.

April  2010

7

Inspection of Retaining Wall at Ampang - Kuala Lumpur Elevated Highway

Projek Lintasan Kota Sdn. Bhd.

March 2010


8

East Coast Expressway Phase 1, Structural Repair to Bridge over Sg. Chedong, Sg. Jempol and Sg. Maran

Terratech Consultants (M) Sdn. Bhd.

March 2010


9

Kajian Kejuruteraan Awalan dan Ujian Beban Gandar 20 Tan ke atas Struktur Jambatan Keretapi No.1 (KM1.00) Di Perai, Butterworth

Keretapi Tanah Melayu Bhd.

February 2010


10

Consultancy to carry out Inspection, Inventorization and Assessment of Bridges along Kuala Lumpur - Karak Highway, East Coast Expressway Phase 1 and Metramac Highway for The Annual Report 2008

MTD Prime Sdn. Bhd.

February 2010